Wednesday, September 7, 2016

Week 1 Team Post

  • Team members, with brief listing of pertinent skills
    • Michael Kemp
      • CAD Design, Assembly manipulation, machining (milling/lathe/waterjet), welding, integration, etc.
    • Martin Chavez
      • 3D printing, CAD
  • Jorge Soto
    • CAD Design, Assembly, Machining(beginner)
  • Team members contact information
    • Michael Kemp
      • Telephone: (559) 577- 5365
      • Email: Michael.Kemp@SJSU.edu
  • Jorge Soto
    • Telephone: (209) 292-1113
    • Email: jorgeLsoto7@gmail.com
  • Martin Chavez
    • Cell: (510) 684-4809
    • Email: martinchvz@att.net
  • Team member responsibilities within the team (who will do what) -may change throughout the semesters
    • Michael Kemp
      • Manufacturing
      • CAD Design and Drawings
      • FEA
  • Jorge Soto
    • Modeling and CAD design
    • Assembly
    • Manufacturing
  • Martin Chavez
    • Sketches
    • CAD
  • Proposal narrative (verbal description of what is proposed to be accomplished, which includes design requirements and deliverables)
    • Over all Bogie Changes
      • Utilize 4130 steel tubing and sheets rather than A513/A36 in order to reduce weight while maintaining rigidity.
      • Simplify design from previous and shorten all possible members to reduce weight and reduce risk of long term beam buckling due to large slenderness ratio.
      • Attempt to integrate all subsystems in a manner that minimizes the volume envelope of the bogie design and reduces risk of interference and catching of members  
    • Steering
      • Shorten wheel mounts
      • Use 2 linear actuator in order to shorten the linkages
      • Look into removing lowe second failsafe wheels
Failsafe
      • One wheel on each side instead of two in order to not overconstrain the system
      • during turns
    • Between bogies
      • Add 2 DOF flexibility between bogies utilizing a drivetrain linkage design

  • Sketches or drawings
  • Critical Path Schedule using   https://gantter.com/   (Gantt chart website) -copy shareale link / screenshot of gantt chart in team blog.
  • Budget (preliminary estimate of the cash and VIK – Value-In-Kind – needed to deliver what is being proposed)   Give an ESTIMATED RANGE for this.
Cost of materials will increase if the material is switched from Structure steel to Chromoly steel. A range from $600 - 1000 for the structure is currently projected, however it is hard to currently determine as new component and configurations have not be determined.